Laserfiche WebLink
1 <br /> INSPECTION REPORT Page 5 . <br /> * Two large capacity diesel fuel tanks were noted without <br /> containment berms, an effort was made to verify requirment in their <br /> SPCC plan but it apparently does not cover that aspect nor do <br /> Colorado regs cover it sufficiently. <br /> CONSTRUCTION IN PROCESS and OTHER COMMENTS <br /> Six thousand feet of pipeline has been installed for mine water <br /> transportation from the rock tunnel to the district office yard . A <br /> multi-media sand filter system is being placed at the lower end of <br /> the pipe for the final treatment of the water prior to discharge . <br /> New batch plant construction on the 42 mine bench for longwall <br /> backf Ill and support . <br /> An attempt is underway to install another longwall in the mine, in <br /> Lhe interim coal stockpiles are being filled out In anticipatation of <br /> ,hut down required for installation. <br /> Sediment ponds in general throughout the mine were clean and <br /> appearances were that the process was being done on a regular basis . <br /> Mine water was being discharged from the rock tunnel pond system, 14- <br /> ", .R� <br /> r�• <br />