Laserfiche WebLink
11/27/79 <br /> Pace 6 of 6 <br /> ASSES SME_117" CON:ERENCE REPORT <br /> k'con- :�_:,ued) <br /> 1 . Notice of Violation./Cessation. order No. 79-V-18-3 <br /> Violation 5 -Df 5 <br /> Failure to conduct operations so as to <br /> (a) Nature of violation minimize water pollution. <br /> (b) Date of te=—ination No termination <br /> 'Procosed Conference <br /> (2) Conference Result Assessment Assessment <br /> (a) History/Prey. V,o. (30) <br /> (b) Seriousness (30) <br /> ( 1 ) PZcba��ili.ty of <br /> Occurrence ( 15) i4 14 <br /> Rate t cf <br /> Damage ( 15) 12 12 <br /> (2 ) Cost. . to Enforcement ( 15) <br /> ( c) Negligence (25) 20 20 <br /> ( d) Good Faith (-10) -10 <br /> Total 46 36 <br /> arrative: <br /> (Brief explanation of reasons for any changes made in assignment of <br /> points and any ad3itional infor•nation that was presented at the <br /> conference. ) <br /> Good Faith: Consistent with the recommendation of the inspector, good faith has <br /> been awarded. The area was regraded, and a berm constructed to prevent the <br /> problem from occurring again. A new grading pattern has been implemented <br /> so that equipment operators will not continue the problem behavior. <br />