My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-10-21_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1985-10-21_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/25/2020 2:56:03 PM
Creation date
10/4/2012 11:22:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
10/21/1985
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M1V-VVN I INtN I n1tbLPUKUtb9 ING. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTINENT RESOURCES INC TELEPHONE <br /> 245 PIAINFIELD ROAD-SUITE 220 (303)963-2MI <br /> WILL BROOK ILLINOIS W521 TW>< <br /> October 29, 1984 910°�6�x <br /> 4"72. <br /> Mr . Jim Herron <br /> Mined Land Reclamation Division <br /> 423 Centennial Building <br /> 1313 Sherman Street <br /> Denver, Colorado 80203 <br /> Re: Minor Revision - Catchment Basins Nos. 1 and 4 Mines <br /> Dear Jim, <br /> Enclosed are some maps and descriptions of the catchment basins <br /> constructed this fall--three at No. 1 Mine and one at No. 4 <br /> Mine. . <br /> The three basins at No. 1 Mine range from 1. 0 A.F. to 1 . 3 acre <br /> feet (80' x 120' x 61 ) and are designed to discharge in series <br /> (see Arrows on map) . We think these catchment basins will be <br /> of benefit in the reduction of probable sediment from the old <br /> road and pad fills adjacent to No. 1 Mine. <br /> One basin (80' x 120' x 61 ) was constructed at the toe of the <br /> old north fill slope at No. 4 Mine. This location is also at <br /> the toe .of one of the newly constructed test sections for mine <br /> pads. We feel that this basin will fill a twofold purpose : <br /> that is , reduce probable sediment from the old fill section and <br /> reduce sediment from the newly constructed pad fill test <br /> section. See enclosed map. <br /> If you have any questions, please call me. <br /> Sincerely, <br /> J-,Environmental Coordinator <br /> Coordinator <br /> DWBowman:ms <br /> Enclosures: Two maps <br />
The URL can be used to link to this page
Your browser does not support the video tag.