My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-11-15_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-11-15_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 5:42:25 PM
Creation date
10/4/2012 10:58:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/15/1993
Doc Name
Bid Documents (IMP) Hydrology Correspondence Part (2 of 2)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT RESOURCES, INC. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTINENT RESOURCES,INC TELEPHONE <br /> 245 PLAINFIELD ROAD-SUITE 220 (303)963-2581 <br /> WILLOWBROOK,ILLINOIS 60521 TWX <br /> 910 929 6894 <br /> August 14, 1984 TLX <br /> 45-0724 <br /> RECEIVE® <br /> Mr. Jim Herron AUG 17 1984 <br /> Mined Land Reclamation Division <br /> 423 Centennial Bldg. MINED LAND RECLAMATION <br /> DIVISI <br /> 1313 Sherman St. Colo. Dept. of Natural ResourcesOr, <br /> Denver, Colorado 80203 <br /> Re: Tunnel Hydrologic Plan <br /> Dear Jim: <br /> We have had continuing problems with heavy rains and excess soil <br /> moisture, as you can see by the June and July precip records. The excess <br /> moisture has kept us from obtaining the proper compaction on both dams <br /> being constructed at the tunnel (Chin & Associates, Glenwood Springs). <br /> This excess moisture has also delayed our construction of the clean <br /> water ditch. <br /> The ponds are about 80 percent done (both discharge pipes are in <br /> place) and the clean water ditch is about 80 percent finished. We are <br /> now into rock, and the going is slow. <br /> We would like to submit a revised completion schedule as follows: <br /> The ponds and the ditch would be completed on or before 8/201/84. We would <br /> also like to submit a revision to our tunnel hydrologic plan at this time, <br /> eY,hich ixuuld include enlarging our temporary pond on the tunnel pad and <br /> making it a permanent sediment pond with the proper outlet and spillway. <br /> The design and calculations will be submitted shortly. <br /> If you have any questions please contact me. <br /> Sincerely, <br /> 00411ea lO <br /> Environmental Coordinator <br /> DWBowman:ms <br /> Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.