My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-11-15_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-11-15_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2021 5:42:25 PM
Creation date
10/4/2012 10:58:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/15/1993
Doc Name
Bid Documents (IMP) Hydrology Correspondence Part (2 of 2)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Long - 2 - December 13, 1988 <br /> C-81-013 - Golden Eaale <br /> The refuse disposal area has diversion ditches designed for 10-year events. <br /> The operator must be notified to modify this design. <br /> C-82-055 - Raton Creek <br /> The diversions and collection ditches around this pile have been designed for <br /> a 100-year and 10-year event. The operator will need to be notified to modify <br /> the 10-year designs to 100-year. <br /> C-045-81 - Newlin Creek <br /> The refuse pile is being used to backfill the lower highwall area. If any <br /> refuse is left at the approved site, 100-year design will need to be addressed <br /> for drainage during the permit renewal period. <br /> C-81 -014 - Southfield <br /> The refuse pile drainage is designed for the 10-year event. Redesign will be <br /> needed for the 100-year event. <br /> C-00-000 - Munger Canyon <br /> The designs need to be modified to allow for passing of the 100-year, 24-hour <br /> event. They are currently designed for both 2 and 10-year events. The site <br /> has not been constructed to date. <br /> C-81-047 - Orchard Valley <br /> The interim phase does not allow for 100-year design for the ditches. The <br /> permanent design does. The operator needs to demonstrate that the <br /> on-the-ground interim ditches will pass the 100-year event. <br /> C-81-047 - Blue Ribbon <br /> The collection ditch has been designed for a 10-year event. The operator <br /> needs to resize the ditches for a 100-year event and modify the ditches as <br /> needed. <br /> CMT/y j b <br /> 1958= <br />
The URL can be used to link to this page
Your browser does not support the video tag.