Laserfiche WebLink
i r <br /> /1J �✓ <br /> nCate <br /> 7----------7/ , <br /> WORKSHEET NO. 16 <br /> RECLAMATION BOND SUMMARY SHEET <br /> I . Total Facility and Structure Removal Costs <br /> 2. Total Earthmoving Costs 4-4- <br /> 3. Total Revegetation Costs OS/Lj 4C Ccp --5 7 <br /> 4. Total Other Reclamation Activities Costs — <br /> 5. Subtotal : Total Direct Costs 3 44-3, !4 <br /> 6. Mobilization and Demobilization (at 2,5� of Item 5) 96 Zq <br /> (1% to 5% of Item 5) ,' <br /> 7. Contingencies (at % of Item 5) ��l O ZD <br /> (see Table 4) <br /> S. Engineering Redesign Fee (at j�.L% of Item 5) 65 1 Z 7 1 <br /> (see Graph 1) <br /> 9. Contractor Profit and Overhead (at -7 7-9 of Item 5) <br /> (see Graph 2) <br /> 10. Reclamation Management Fee (at of Item 5) <br /> (see Graph 3) j/1 <br /> 1i. GRAND TOTAL BOND AMOUNT E 4 3 � I <br /> (Sum of Items 5 through 10) <br /> Engineering News Record Cost Index: Date: <br /> A-18 <br />