My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (19)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (19)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:57:23 PM
Creation date
10/4/2012 8:46:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) CV-91-015
Violation No.
C-91-015
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION DIVISION <br /> STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br /> NOTICE OF VIOLATION NOV No. <br /> Permit No. : -,-1 'c, Mine: <br /> Type of Mine: c_r ,.fir.u s{4 �.� ,�" ./��.�, County: <br /> Operator (If Other than Permittee) : Permittee: Sc-' .,,t, <br /> Mail Address: <br /> Mail Address: <br /> Date/Time of Inspection: <br /> Inspector: 7 `� <br /> /1 <br /> Person Served: Served By: <br /> ignat e of-perlton sery d Signature of authorized representative <br /> of Mined Land Reclamation Division) <br /> (Please print name and title) Date and Time of Service: <br /> CERTIFIED MAIL NO. <br /> Return Receipt Requested <br /> The Mined Land Reclamation Division ( "the Division") has conducted an inspection of <br /> the above mine and has made the findings stated in the attached schedule and has <br /> found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br /> of required permit conditions, listed in the attached schedule. This notice <br /> constitutes a separate notice of violation for each violation listed. <br /> You must abate each of these violations within the designated abatement time. <br /> Where the remedial action requires submission of plans, the plans are to be <br /> submitted to the Division within the designated time. You are responsible for <br /> doing all work in a safe manner in compliance with all applicable laws and <br /> regulations. <br /> The undersigned finds that cessation of mining is is not I--" expressly, or in <br /> practical effect, required by this notice. For this purpose, "m ning" means <br /> extracting coal from the earth or from a waste pile and transporting it within or <br /> from tlhe mine site. <br /> C.R.S. 1973s 34-33-123(8) provides for imposition of civil penalties of up to <br /> $5,000 for each violation and provides that each day of continuing violation may be <br /> deemed a separate violation. <br /> Important: Please read the reverse side of this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.