Laserfiche WebLink
- 5 - <br /> associated facilities need to be develcced and submitted for <br /> inclusion in the permit. Roads ana facilities which have no <br /> further useful purpose should be reclaimed. <br /> Examples include the following: <br /> - The light use road from Mine 4 over the top of Huntsman Ridge to <br /> the subsidence monitoring monuments. <br /> - The aline 1 , South Portal road . <br /> - The roan 'wnicn accesses the SAT ponds below mine 1 . <br /> - Pilot oads above cut or below fill which contribu_e to eresien <br /> associated with Roads C and D. <br /> "Short cut" road between Mine 2 bin pad and Mine 3, and connected <br /> road which accesses an air vent above the Mine 3 bench. <br /> Road to the upper fan portal from Mine 1 . <br /> Road from Mine 5 to fan portal adjacent to the AML strip pit <br /> reclamation project. <br /> All such roads and the facilities they access should be C!:molet?ty <br /> reclaimed if they are no longer needed. If still nes.de,.4 for <br /> occasional access , such roa::s�need to be s_abilized by construction <br /> of wa_erbars and dips and revegetation of eroding cuts and fills . <br /> In most cases , given the nature of the roads and their infrequent <br /> use , the road surfaces should be ripped and seeded to provide <br /> aaditional sediment control . <br /> Problem: General state or disrsoair and imorecer management of non coal <br /> :paste at ocr`al si -gs ( ses 11CV C-91-022 and NCV C-31 -023) <br /> General cleanup and main_ena„ce , along with demoiition or repair of <br /> dilaoidated structures is needed at the various portal site: . <br /> Specific plans and timetables addressing waste management and <br /> general site maintenance should be incorporated into the permit. <br /> Problem: <br /> Sedime^tation from mine bench downslooes <br /> Contributing factors : <br /> - Long, steeo , unvegetated slooes <br /> - Avalanche chutes <br /> - Snow removal - material pushed over downslooes <br /> - Limited availability of suitable sites for sediment pond <br /> constr uc.ion <br /> The current operations and reclamation plan for the portal bench <br /> downslcpes calls for no gracing , revegetation or other <br /> stabilization measures to be aoolied prior to final reclamation . <br /> Unless final reclamation is to be implemented within the next year, <br /> plans addressing interim stabilization and sediment control for <br /> the portal bench downslopes will need to be included in the permit <br /> revision application. <br /> Mine <br />