My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (10)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:44:06 PM
Creation date
10/4/2012 8:46:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) Violation CV-90-049
Violation No.
C-90-049
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Along numerous sections of the road, runoff from the road surface or from <br /> overtopped ditch segments has flowed down the road for some distance and <br /> eventually has run off the road in an uncontrolled manner, resulting in <br /> fill slope erosion. Rill erosion due to such uncontolled drainage has <br /> occurred between Sta. 90+00 and 70+00, Sta. 50+00 and 47+00. and Sta. <br /> 35+00 and 32+00. <br /> 9. At approximately Sta. 87+00, a bedrock outcrop has apparently prevented <br /> ditch excavation and has resulted in ditch overtopping. <br /> 10. From approximately Sta. 25+00 around the Arctic Circle switchback, flows <br /> have escaped the ditch as a result of sediment accumulation and resulted <br /> in rilling of the road surface. <br /> Road B <br /> 11 . All along Road B, sediment has been deposited in the timbered buffer zone <br /> along the South Fork of Dutch Creek as a result of uncontrolled runoff <br /> from the road surface, overtopped ditches and culvert discharge. <br /> 12 . As with other road ditches , the Road B ditch is alternately scoured in <br /> some segments and there is evidence of previous debris accumulation and <br /> overtopping in other locations . Rock checks required by the approved <br /> plan to slow velocities have not been installed . Ditch scouring is <br /> severe for most of the distance between Sta. 35+00 and culvert B-3 at <br /> Sta. 24+10. Ditch flows through this segment have cut into the toe of <br /> the cut slope, resulting in continuing sloughage of soil from the cut <br /> into the ditch. At approximately Sta. 30+00, the ditch has been <br /> partially filled in with sediment from erosion within the B-5 drainage, <br /> above. <br /> Road G <br /> 13. In several locations , road drainage ditches have not been constructed or <br /> maintained to provide design capacity. The following areas of violation <br /> were noted: <br /> a. Various road segments on the upper portion of the road above <br /> Culvert G-24, including sections of the road ditch which drain into <br /> the Mine 5 sediment pond within the Mine 5 disturbed area. <br /> b. Ditch section between Sta 115+00 and Culvert G-18 was partially <br /> filled in, in places , and had overtopped in the past, resulting in <br /> some flow across the road and over the outslope . <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.