Laserfiche WebLink
Fault <br /> The certifications in the permit for these ponds are design plans. No <br /> as-built certifications could be located. It appears to me that the plans <br /> were approved, but the operator never followed through with the reconstruction <br /> or provided as built certifications. It appears these ponds have been <br /> designed since March 1986, at the latest. At least four years have passed <br /> since they were approved. This represents a high level of negligence, and I <br /> agree with the $750.00 for fault. <br /> Good Faith <br /> The NOV has not been abated. <br /> Final Civil Penalty <br /> History $ 250.00 <br /> Seriousness 250.00 <br /> Fault 750.00 <br /> Good Faith 0.00 <br /> TOTAL 1250.00 <br /> /ddh <br /> 2704F <br />