My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (7)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 1:07:41 PM
Creation date
10/4/2012 7:57:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP)CV-90-051
Violation No.
C-90-051
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINED LAND RECLAMATION DIVISION <br /> STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br /> NOTICE OF VIOLATION NOV No. "'- • ' <br /> ' -7 " 1 <br /> Permit No. . - - Mine: <br /> Type of Mine: ��, — County: <br /> Operator ( If Other than Permittee): Permittee: �`- <br /> Mail Address: <br /> Mail Address: <br /> Date/Time of Inspection: <br /> Inspector: <br /> Person Served: Served By: <br /> (Signature of person serve ignature o authorized represen ative <br /> of Mined Land Reclamation Division) <br /> (Please print name and title) Date and Time of Service: <br /> _ A <br /> CERTIFIED MAIL NO. `� �'� f�7 -;, !l P.M. <br /> Return Receipt Requested <br /> The Mined Land Reclamation Division ( "the Division" ) has conducted an inspection of <br /> the above mine and has made the findings stated in the attached schedule and has <br /> found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br /> of required permit conditions , listed in the attached schedule. This notice <br /> constitutes a separate notice of violation for each violation listed. <br /> You must abate each of these violations within the designated abatement time. <br /> Where the remedial action requires submission of plans , the plans are to be <br /> submitted to the Division within the designated time. You are responsible for <br /> doing all work in a safe manner in compliance with all applicable laws and <br /> regulations. <br /> The undersigned finds that cessation of mining is is not :� expressly, or in <br /> practical effect, required by this notice. For this purpose, `ffiining" means <br /> extracting coal from the earth or from a waste pile and transporting it within or <br /> from the mine site. <br /> C .R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br /> $5 ,000 for each violation and provides that each day of continuing violation may be <br /> deemed a separate violation. <br /> Important: Please read the reverse side of this page. <br /> WHITE - File PINK - Operator YELLOW - Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.