Laserfiche WebLink
Mid-Continent Resources, Inc. <br /> PRODUCERS OF THE.FAMOUS COAL BASF COKING CO.kL. <br /> NIID.CONTINENT RESOURCES.INC. 201 Centennial Street <br /> ti'Lo 1'L�1NI 1f:[,Il ROAD•SITITE 220 Slllte 406 Telephone; <br /> WILLOWHR(W)H,ILLINOIS 60631 Glenwood Springs, Colorado 81601 (9U3) 9�5-496Ei <br /> October 31, 1990 <br /> Mike Savage <br /> MLRD <br /> Room 215 <br /> 1313 Sherman <br /> Denver, CO 80203 <br /> RE: NoV C-90-049, C-90--050, C-90-051, C-90-052 <br /> Dear Mr. Savage: <br /> During the inspection of October 23 , 1990 the Division issued four <br /> notices of violation, including NoV(s) C-90-049, C-90-051 and C-90- <br /> 052 , which require abatement by November 23 , 1990, and C-90-050, <br /> which requires abatement by December 23 , 1990 . <br /> The abatement steps, including modification of ponds, repair of <br /> road culverts, repair of a ditch, and repair and/or construciton of <br /> sediment control structures, require extensive work which is not <br /> feasible or desirable during the winter months. <br /> As you know, the mine site is at high elevation (8,000' to 10, 000' ) <br /> and we have already entered the frost and snow season. Completion <br /> of the work required by the NoVs under frost and snow conditions <br /> would be difficult if not impossible , and the disturbance to the <br /> ground would be environmentally harmful. <br /> Accordingly, Mid-Continent requests an extension of the period <br /> allowed for abatement by 90 days in consideration of the the <br /> climatic conditions at the mine site. <br /> The regulations of the Division at §5.03 .2( 2) (b) provide that an <br /> extension of the abatement period originally fixed may be allowed <br /> when due to circumstances which include at §5.03. 2( 2) (c) (iv) : <br /> W?]AYE o11.1Y1d V11= a du• L•o n C'2j.innt.i C:'d e�ars81 t;1.one CLA>,*Vj"ment <br /> cf�y6. pY wl�br6 r <br /> wtCJY1n DO CYdyv 4=1etd2:-,7y wosilB ppuBb yYfiYw erivYr`anmenK:e�3 <br /> j.IYm t;hw» it WUU.7.{7 prevlf lltf <br />