My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (5)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 1:04:56 PM
Creation date
10/4/2012 7:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) TDN X-90-02-370-001- TV2
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENT OF ■ <br /> .'ye TAI ems; <br /> United States Department of the Interior a EW <br /> ° OFFICE OF SURFACE MINING = <br /> RECLAMATION AND ENFORCEMENT ■ <br /> q,b cF 1e�q SUITE 310 3 <br /> 625 SILVER AVENUE, S.W. <br /> ALBUQUERQUE, NEW MEXICO 87102 In Reply Refer To. <br /> January 7, 1991 <br /> JA N 3 0 1991 <br /> Mr. Dan Mathews, Acting Coal Program Supervisor <br /> Mined Land Reclamation Division <br /> Department of Natural Resources <br /> 215 Centennial Building <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> Re: Colorado Mined Land Reclamation Division's (MLRD) Response Dated <br /> December 19, 1990, to Ten-Day Notice (TDN) 90-02-370-001, TV2, Coal <br /> Basin Mine C-81-017 <br /> Dear Mr. Mathews: <br /> The Albuquerque Field Office (AFO) of the Office of Surface Mining <br /> Reclamation and Enforcement (OSM) received the above-referenced final <br /> response on December 26, 1990. AFO has reviewed MLRD's written and oral <br /> responses to this TDN and renders the following finding in accordance <br /> with 30 CFR 842.11(b) (1) (ii) (B) (1) : <br /> Violation 1 of 2 <br /> AFO has previously notified MLRD that its response as amended was <br /> appropriate. The operator was required to submit the demonstration <br /> documentation within the 30-day time period. <br /> Violation 2 of 2 <br /> AFO understands from the written and oral responses that: (1) A <br /> revision to the Coal Basin permit was approved on or about December 21, <br /> 1990. This revision addresses the mine water discharge that was a <br /> subject of the TDN; (2) this revision requires the operator to screen <br /> the mine water in the mine to filter the coarse materials from the <br /> water, use flocculent chemical treatment of the mine water at the Rock <br /> Tunnel mouth, and route the water through pond No. 020 prior to <br /> discharge into Coal Creek. In case of clean-out or an emergency, the <br /> discharge will be routed to the No. 001 pond prior to discharge into <br /> Coal Creek. The No. 016 pond will only receive the mine water in case <br /> the other sedimentation ponds referenced above become dysfunctional for <br />
The URL can be used to link to this page
Your browser does not support the video tag.