Laserfiche WebLink
Mid-Continent made every effort to obtain sufficient water from <br /> GW-1 for testing of other parameters , as required. As a result cf <br /> �,rvature _ '.". nc- Pi tc, .,y, 4el I , tric- t,t s2 _mica"' I'li. 'E- <br /> c;uid .lE. LScu ; v,.. aIz_e;'ra-zi,'7e , namely the wu:.E:r vt; lE , Hlci <br /> used with only limited success. <br /> After repeated efforts, an ingenious and successful alternative was <br /> devised. This required substantial effort on the part of Mid- <br /> Continent personnel. <br /> There is no indication of any problem(s) with water quality in the <br /> GW-1 well . <br /> The Act, as cited in NOV C-90-001 , requires the operator to: <br /> 34-33-122( 2) <br /> a) Establish monitoring sites to record the effect of <br /> the operations on the level and amount of such <br /> water; <br /> b) Maintain records of well logs and borehole data; <br /> 34-33-122( 3) <br /> The division shall require such monitoring of surface and <br /> groundwater quality, both on and off the site, as it <br /> deems necessary to determine compliance by permittees <br /> with the water quality provisions of this article. <br /> The Regulations, as cited in NOV C-90-001 , require groundwater <br /> monitoring: <br /> 4 . 05. 13 <br /> Surface and Ground Water Monitoring <br /> 1) Ground water <br /> a) Ground water levels, infiltration rates, subsurface <br /> flow and storage characteristics, and the quality <br /> of ground water shall be monitored in a manner <br /> approved by the Division after consultation with the <br /> Division of Water Resources to determine: <br /> i) The effects of surface or underground mining <br /> activities on the quantity and quality of water in <br /> water systems in the permit area and adiacent area.- <br /> and <br /> The effect of surface mining activities on the <br /> recharge capacity of reclaimed lands. <br /> 3 <br />