My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_ENFORCEMENT - C1981017 (2)
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981017
>
_ENFORCEMENT - C1981017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2020 12:59:08 PM
Creation date
10/4/2012 7:38:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
Enforcement
Doc Name
Bid Documents (IMP) CV-90-014
Violation No.
C-90-014
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F�/wes f <br /> STATE OF COLORADO <br /> MINED LAND RECLAMATION DIVISION R C C C IVE D oF.Co� <br /> Department of Natural Resources �� - <br /> �e <br /> Sherman St.,Room 215 Den <br /> Denver,C080203 AUG 2 7 1990 .��;�}' <br /> 303 866-3567 ' 1876 <br /> FAX: 303 832-8106 <br /> Mined Land Go r. <br /> Reclamation Division Fred R.Banta, <br /> SETTLEMENT AGREEMENT Division Director <br /> Cessation Order No. Notice of Violation No. C-90-014 <br /> Mine Name: Coal Basin Mines Permit No.: C-81-017 <br /> Permittee: Mid-Continent Resources <br /> Mailing Address: P.O. Box 500, Carbondale, Colorado 81623 <br /> Operator <br /> (If Other than Permittee): <br /> Mailing Address: <br /> County: Pitkin, Gunnison, Garfield <br /> Type of Mine: Underground, Federal <br /> The Mined Land Reclamation Division ("the Division" ) issued a certain Notice <br /> of Proposed Amount of Civil Penalty, and the operator requested a conference <br /> thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br /> having been held as required by law, on Puly 17, 1990, the Division and the <br /> operator hereby agree as follows: <br /> 1 . The amount of the penalty shal 1 be $ ©( , <br /> 2. The penalty shall be paid to the Division by the operator not later <br /> than 30 days from the date hereof; <br /> 3. Payment of such penalty by the operator shall constitute a waiver <br /> of all further rights to review of such penalty or of the violation <br /> on which it is based. <br /> This agreement shall not be effective unless signed by the operator within ten <br /> days after the closing date of .su rt .conference, which date is set forth hallow <br /> opposite the signature of the Conference Officer. If not so signed, the <br /> Division will fix the penalty at whatever amount it deems appropriate, based <br /> upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br /> DATE: OPERATOR <br /> By <br /> DIVISION OF MINED LAND RECLAMATION <br /> DATE: By6U Lk, /Y <br /> �� <br /> no&7W ff y <br /> cer <br /> Penalty Adju s ent Reviewed By 7A_11 <br /> [Rule 5.04.3(4)(c)] Div1 on rector <br /> C.R.S. 34-33-123(8)(c)(d) <br /> 9034F <br />
The URL can be used to link to this page
Your browser does not support the video tag.