Laserfiche WebLink
Memo/Re:MC Mid-term Bond Resp. - 5 - July 14, 1986 <br /> 5) Total reclamation of the loadout will be necessary for bonding <br /> purposes unless the operator can meet the requirements of Rule <br /> 4.16.3. <br /> 6) All indirect costs must be included in the bond estimate. <br /> Based on these findings, Mid-Continent may present any evidence which they <br /> believe accurately reflects reclamation costs at the Coal Basin Mines. This <br /> response should include at a minimum the information specifically required in <br /> this memo. The operator should be given a timeframe within which to respond. <br /> The Division will then recalculate the bond, considering the evidence provided. <br /> /dlm <br /> 2124F <br />