Laserfiche WebLink
• <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2, Total Earthmoving Costs <br />3. Total Revegetati on Costs ?0,7 <br />4. Total Other Reclamation Activities Costs <br />5, Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (et <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />B. Engineering Redesign Fee (et % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (et <br />(see Graph 3) <br />GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through 10) <br />% of Item <br />% of Item 5) <br />5) <br />s <br />Engineering News Record Cost Index: Date: <br />16 C ! ° <br />t >Z7 L s <br />-t- P ',Li <br />$ 4-327 <br />U o 7 4- <br />7 <br />) <br />W2 <br />