Laserfiche WebLink
Po AD <br />WORKSHEET N0. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2. Total Earthmoving Costs <br />3. Total Revegetation Costs 1¢.7194- <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at % of item 5) <br />(see Graph 3) <br />II. GRAND TOTAL BOND AMOUNT <br />(Sum of Items -5 through 10) <br />Engineering News Record Cost Index: Date: <br />s G 4,e6C 9 TO <br />7,e,.r#i L s 3 cv7 <br />D RAFT <br />$ a2 37 <br />3971 <br />968 <br />S <br />4 <br />j/ �� � i lL . � •_ T <br />CR144 -6tV l o,zrA L , - 7Y/ 2,74-S64 <br />agf 0‘1 c S 2-4 <br />