Laserfiche WebLink
• <br />Data Sources: <br />EarthmovIng Activity: <br />Productivity Calculations: <br />Cycle time = + <br />haul time <br />(loaded) <br />Net Bucket Capacity = <br />/\ D C <br />Ta )mac_ r 'f— <br />/37fco 7o /s g7 <br />PRODUCTIVITY AND HOURS REQUIRED FOR LOADER USE <br />return time <br />(empty) <br />heaped bucket <br />capacity <br />yd 3 x <br />WORKSHEET N0. 8 <br />basic <br />cycle time <br />Characterization of Loader Used (type, size, etc.): k, <br />- C47 `7 <br />r D7 / <br />Description of Loader Use (origin, destination, grade, haul distance, etc.):... <br />o' 7 64 �n fG <br />bucket fill <br />factor <br />Hours Required = < 6 7 6:9 Yd3 ; Z../ Z yd 3 /hr = ,3 hrs <br />volume to be net hourly <br />moved production <br />min <br />Date <br />Y <br />d <br />Project /7, A <br />9/2..4--/q3 <br />' <br />Net Hourly Production = yd 3 min x 50 min /hr = Z I Z yd /hr <br />net bucket cycle time work hour <br />capacity factor <br />Fr, <br />- • t7 <br />?. D e , <br />/06,44 <br />/3/. 74 <br />