Laserfiche WebLink
DRAFT <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Tota I Fac i 1 i ty and Structure Removal Costs 3 go /f. ib /7f, €3.s--S, J 5 ! ) y,/ - � 5 O <br />2. Total Earthmoving Costs 7_0 6`7 4- `7 375 4-4L ,250 <br />` <br />3. Total Revegetation Costs <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />-- 6. Mobilization and Demobilization (at / % of Item 5) <br />S (l% to 5% of Item 5) <br />k 7. Contingencies (at 4_% of Item 5) . <br />(see Table 4) <br />8. Engineering Redesign Fee (at L'% of Item 5), <br />H (see Graph 1) <br />9. Contractor Profit and Overhead (at S % of Item 5) <br />(see Grapn 2) <br />10. Reclamation Management Fee (at 1,4 of Item 5) <br />(see Graph 3) <br />II. GRAND TOTAL BOND AMOUNT _ <br />(Sum of Items 5 through )0) <br />Project <br />Date <br />Engineering News Record Cost Index: Date: <br />