Laserfiche WebLink
WORKSHEET NO. 16 <br />i,U RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2. Total Earthmoving Costs <br />3. Total Revegetation Costs 36,2_40, 4.044 <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph I) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at % of Item 5) <br />(see Graph 3) <br />II. GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through, 10) <br />$ a 7� <br />i c2 ii„° 7 4-' <br />Engineering News Record Cost Index: Date: <br />/\ o,1 n C / S C' fy v Cg T o <br />I <br />/C-T- 4 0/v / <br />5 <br />/ , 4 D 21 <br />4— <br />( <br />/ 14 <br />/g <br />2.96 <br />/57, c/ / <br />1, 2 1(„. 11 <br />4g <br />— 10 <br />/1233,L)—(76 <br />