Laserfiche WebLink
f 7AP A <br />II. GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through 10) <br />� z7 7/--5 <br />T 1 F lo 04-9 = rs /g4- <br />_5" <br />/g1“ <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SIJ44ARY SHEET <br />I. Total Facility and Structure Removal Costs <br />2. Total Eerthmoving Costs <br />3. Total Revegetation Costs V 4 � t 3 <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at. <br />(see Graph 3) <br />% of Item 5) <br />Ch C <br />Engineering News Record Cost Index: Date: <br />S <br />7, <br />/rzr44-. 1 <br />Do: <br />E <br />/2011O 1 ' is Gbr rr)oN ro ALC <br />b • 3737 <br />734 <br />J2 <br />r <br />