Laserfiche WebLink
Earthmoving Activity: <br />Production Rate = <br />Hourly Production = <br />Hours Required = <br />Data Sources: <br />L <br />7b9 G <br />WORKSHEET NO. 9 <br />PRODUCTIVITY AND HOURS REQUIRED FOR TRUCK USE <br />truck capacity <br />product ron rate <br />3 <br />yd x <br />Characterization of Truck Used (type; size, etc.): <br />Description of Truck Use (origin, destination, grade, haul distance, truck capacity, etc.): <br />Productivity Calculations: <br />Cycle time = /'Z + + 3,�� + `� = ( p ,7 / min <br />haul time return time total loading dump and <br />time maneuver <br />time Tith641 <br />Number o f Trucks Required = 6 ' / _ 1 3 3 i 2 <br />truck cycle time total loading time <br />/ of trucks cycle time <br />yd /min x 50 min /hr = yd /hr <br />work hour <br />factor <br />3 3 <br />yd yd /hr = <br />volume to be moved • hourly production <br />min <br />3 <br />yd /min <br />hrs <br />