Laserfiche WebLink
O/2Ti94.- 5 <br />/ C iG o6 /C A E!//1 lJ4f / <br />• <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />2. Total Earthmoving Costs <br />3. Total Revegetation'Costs SST 0 4-6 6 <br />4. Total Other Reclamation Activities Costs <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at <br />(see Graph 3) <br />II. GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through 10) <br />% of Item 5) <br />S <br />Engineering News Record Cost Index: Date: <br />-Project / (� <br />Date 9 { ZLseJg 33 <br />DRAFT <br />$ ZOoa <br />3/91 t! <br />l7�lD _ 241-3 2 <br />f <br />