Laserfiche WebLink
P o - r4 4-- 4- <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2, Total Earthmoving Costs <br />3. Total Revegetation.Costs 10,4-101-1964— <br />4 <br />Pp ro <br />4. Total Other Reclamation Activities Costs 4. --14404_ Ia,005 <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(I% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at % of Item 5) <br />(see Graph 2) <br />10. Reclamation Management Fee (at % of Item 5) <br />(see Graph 3) <br />I1. GRAND TOTAL BOND AMOUNT <br />(Sum of •Items 5 through 10) <br />s <br />Engineering News Record Cost Index: Date: <br />Project G <br />Date 9121 7 3 <br />DRA <br />$ 37SZ( 3 , <br />920 <br />03 <br />