Laserfiche WebLink
1 --- Z2,1z2rx <br />WORKSHEET NO. 16 <br />RECLAMATION BOND SUMMARY SHEET <br />1. Total Facility and Structure Removal Costs <br />2. Total Earthmoving Costs <br />3. Total Revegetation Costs 4,9424- <br />t p _ <br />4. Total Other Reclamation Acti It ePs f Cos s �/��/, 1C,�1Q O f <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at <br />(1% to 5% of Item 5) <br />7. Contingencies (at <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at <br />(see Graph 2) <br />10. Reclamation Management Fee (at <br />(see Graph 3) <br />GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through 10) <br />% of item 5) <br />% of Item 5) <br />% of Item 5) <br />% of Item 5) <br />s <br />Engineering News Record Cost Index: Date: <br />Protect <br />Date <br />DRAFT <br />$ <br />/ � <br />497.1- /Ho <br />4°9s)g <br />tip <br />7.16 <br />