Laserfiche WebLink
WORKSHEET NO. 16 <br />RECLAMATION BOND SUMdARY SHEET <br />I. Total Facility and Structure Removal Costs <br />2. Total Earthmoving Costs <br />3. Total Revegetation Costs 3 `) 4 4 ° 64— <br />10/2, <br />4. Total Other Reclamation Activities Cos s #A L/Z, ee,Q 4. <br />5. Subtotal: Total Direct Costs <br />6. Mobilization and Demobilization (at % of Item 5) <br />(1% to 5% of Item 5) <br />7. Contingencies (at % of Item 5) <br />(see Table 4) <br />8. Engineering Redesign Fee (at % of Item 5) <br />(see Graph 1) <br />9. Contractor Profit and Overhead (at <br />(see Graph 2) <br />10. Reclamation Management Fee (at % of Item 5) <br />(see Graph 3) <br />II. GRAND TOTAL BOND AMOUNT <br />(Sum of Items 5 through, 10) <br />% of Item 5) <br />S <br />Engineering News Record Cost Index: Date: <br />Project <br />Date 7724 <br />LA <br />LA <br />$ <br />3 __ 1 <br />fS 44'3 f- / / 0 -16 5 8 3 <br />4-3543 <br />