Laserfiche WebLink
4) <br />5) <br />Othe Items to be Demolished: <br />Data Sources: <br />i <br />20 Cir(l <br />g C, <br />L <br />,),/p /dovs <br />Debris Handling and Disposal Costs: <br />,TL_c_ re S.rr <br />/i1�Lc l)t / — <br />-1 L. / <br />WORKSHEET NO. 2 <br />STRUCTURE DEMOLITION AND DISPOSAL COST SUMMARY <br />Project ,2 6 <br />/ <br />Date 9/Z7F <br />Listing of Buildings to be Demolished: <br />Type of Construc- Volume Unit Cost Demolition <br />Item tion Material (cubic feet) Basis Cost <br />��I a9 600 <br />I) 1 f ? Til / � — ,Q G5 • S/ -- 1OA/ r 5(7% <br />c <br />2) i )oNl/� To I % p - I "—C- 4- ,5-0 2 S // 2Z <br />3) - o 2 -4 - 1 42 - (, /,‘. <br />Total Cost = S /5 <br />/076 <br />TOTAL DEMOLITION AND DISPOSAL COST = S / ) 4.O / <br />