My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-11-26_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
1993-11-26_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 5:15:29 AM
Creation date
10/3/2012 10:00:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
11/26/1993
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAKE <br />United States Department of the Interior AMERICA <br />PRIDE IN <br />OFFICE OF SURFACE MINING <br />OCH 3/ Reclamation and Enforcement <br />Suite 1200 <br />Mr. Michael B. Long, Director <br />Division of Minerals and Geology <br />Department of Natural Resources <br />215 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Dear Mr. Long: <br />Enclosures <br />505 Marquette Avenue N.W. <br />Albuquerque, New Mexico 87102 <br />November 24, 1993 <br />Sincerely, <br />Robe <br />Albuq <br />NOV <br />o <br />IN REPLY REFER TO. <br />1993 <br />Enclosed is a copy of the supporting cost estimate worksheets for the Coal Basin <br />Mine complex. These worksheets were developed by the technical staff in the <br />Office of Surface Mining Reclamation and Enforcement's (OSM) Western support <br />Center and by Michael Superfesky of the Morgantown Field Office. The <br />Albuquerque Field Office combined these various worksheets into the cost estimate <br />dated November 9, 1993, that was sent to you. <br />These worksheets are stamped draft. As you are aware, the cost estimate dated <br />November 9, 1993, was based on the best available information to OSM's <br />technical team and_should not be considered OSM's final cost estimate. At this <br />time, OSM does not plan to revise this cost estimate unless conditions warrant it. <br />gen, Director <br />e Field Office <br />
The URL can be used to link to this page
Your browser does not support the video tag.