My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (314)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (314)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:37:31 PM
Creation date
9/28/2012 11:22:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-7- <br /> Fixed time - 1.1 minutes <br /> Haul time 0% resistance - 1 .45 min. <br /> Return time 6% resistance - 1.65 min. <br /> Cycle Time 4.2 min. <br /> A total of 3 scrapers can be loaded by one D9L. Therefore, 6. 5 hours would be <br /> required for this portion. <br /> A total of 1,300 CY of topsoil must be replaced on the bus garage ponds. The <br /> haul distance is 3,100 feet. A 637D scraper would have the following cycle <br /> time. <br /> Fixed time - 1.1 minutes <br /> Haul time 0% resistance - 1 .25 min. <br /> Return time 6% resistance - 1 .45 min. <br /> Cycle Time .8—min. <br /> A total of 3 scrapers can be loaded by one D9L. Therefore, 3.8 hours are <br /> required to complete this portion. <br /> The cost for topsoiling the portal area and sediment ponds is $9,998.00. <br /> Portal Sealing pJ C <br /> Mean' s Crew C-20 can pour 105 CY per day. The concrete plug required 56 cubic <br /> yards. Therefore, 4.25 hours are required to complete this job. At $2,061.00 <br /> per day, the total cost for installing the plug would be $1,100.00. <br /> Revegetati on C, 'i <br /> The reclamation plan requires seeding and mulching, plus fertilization if <br /> necessary. It is assumed that at least one application of nitrogen and <br /> phosphorus will be required. Also, it is assumed that the disturbed areas <br /> will be mulched at the rate of two tons per acre. The cost per acre is broken <br /> down as follows : <br /> Mulch 2 tons/acre @ $75.00/ton = $ 150.00 <br /> Mulch spreading @ 4 acres/day/person = 36.00 <br /> Fertilization = 40.00 <br /> Seed = 200.00 <br /> Hand Seeding = 30.00 <br /> Total Cost Per Acre $ 456.00 <br /> ;A total of 13.5 acres will be required to reclaimed. This figure is above <br /> that determined by Mid-Continent because a disturbance corridor of 75 feet was <br /> used rather than 50 feet. The total cost for revegetation would be $6, 156.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.