My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (313)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (313)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:35:04 PM
Creation date
9/28/2012 11:21:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MID-CONTINENT'S CX-193-00 STIPULATIONS <br /> 1 . TREE REMOVAL WILL BE LIMITED TO THOSE MARKED OR DESIGNATED ON THE <br /> GROUND DURING THE FIELD TRIP OF AUGUST 1 , 1985, WITH DOUG BOWMAN, JOHN <br /> HILL AND MIKE WARD. IN THE AREAS WHERE CENTERLINE TREES WERE MARKED, <br /> AN 8 FT. LIMIT ON EITHER SIDE OF THE CENTERLINE IS ESTABLISHED. <br /> TREES WILL BE FLUSH CUT AS CLOSELY AS PRACTICABLE TO THE GROUND AND <br /> PULLED LENGTHWISE OUT OF THE RIGHT-OF-WAY. AFTER OPERATIONS ARE <br /> COMPLETE, TREES AND SLASH WILL BE PULLED BACK INTO THE RIGHT-OF-WAY TO <br /> PRESENT A NEAR NATURAL APPEARANCE. <br /> 2. IF DRILL PADS BECOME NECESSARY, THEY WILL BE STRIPPED OF TOPSOIL WHICH <br /> WILL BE USED TO RECLAIM THE SITE WHEN WORK IS COMPLETED. THESE PADS <br /> WILL BE RECONTOURED TO NEAR NATURAL CONFIGURATION UPON COMPLETION OF <br /> THE REQUIRED WORK. <br /> 3. STEEL TANKS WILL BE USED TO CONTAIN WATER AND/OR DRILLING FLUIDS. THIS <br /> EFFLUENT WILL BE HAULED FROM THE FOREST. <br /> 4. IF WATER IS DISCOVERED, TEN GALLONS PER MINUTE OR LESS MAY BE <br /> DISCHARGED ON THE SURFACE IN SUCH A MANNER THAT EROSION WILL NOT <br /> OCCUR. OVER TEN GALLONS PER MINUTE WILL EITHER BE CONTAINED OR SPRAYED <br /> IN SUCH A MANNER THAT EROSION WILL NOT OCCUR. <br /> 5. SURPLUS MATERIALS (CEMENT, ETC. ) WILL EITHER BE HAULED OFF OR BURIED <br /> WITH CONCURRENCE OF THE DISTRICT RANGER. <br /> 6. APPROVED SPARK ARRESTERS WILL BE REQUIRED ON ALL COMBUSTIBLE ENGINES <br /> USED ON THE JOB. <br /> 7. ALL RECLAMATION WORK WILL BE COMPLETED 30 DAYS AFTER THE HOLES ARE <br /> COMPLETED UNLESS AN EXTENSION IS GIVEN IN WRITING BY THE DISTRICT <br /> RANGER. <br /> 8. MID-CONTINENT'S PERFORMANCE B044D FILED WITH MINED LAND RECLAMATION <br /> DIVISION WILL APPLY TO THIS PROJECT. PRIOR TO BOND RELEASE, FOREST <br /> SERVICE CONCURRENCE THAT RECLAMATION WORK IS COMPLETE IS REQUIRED. <br /> 9. VIOLATIONS OF THESE STIPULATIONS ARE GROUNDS FOR "SHUTTING DOWN" ANY OR <br /> ALL OPERATIONS PERMITTED UNDER THIS AGREEMENT. "SHUT DOWN" NOTICES <br /> WILL BE GIVEN IN WRITING BY THE DISTRICT RANGER OR HIS REPRESENTATIVE. <br /> 10. OPERATIONS WILL NOT BE ALLOWED UNDER MUDDY OR WET CONDITIONS. <br /> 11 . EROSIONS CONTROL - THE PERMITTEE SHALL BE RESPONSIBLE FOR THE <br /> PREVENTION AND CONTROL OF SOIL EROSION AND GULLYING IN THE AREA COVERED <br /> BY THIS PERMIT AND LANDS ADJACENT THERETO WHERE EROSION IS DUE TO <br /> EXPLORATION ACTIVITIES UNDER THIS NOTICE OF INTENT. <br /> 12. WATER BARS WILL BE REPLACED AS THEY NOW EXIST AND INSTALLED WHERE <br /> APPROPRIATE TO PREVENT EROSION ONCE PERMITTED OPERATIONS ARE COMPLETED. <br />
The URL can be used to link to this page
Your browser does not support the video tag.