My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (317)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (317)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:39:52 PM
Creation date
9/28/2012 9:57:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NO 4 410 84 DATE 10-26-84 <br /> _ <br /> TO ' Schmueser & Associates, Inc. chen and associates, inc. g 2 2 <br /> DAILY REPORT NO SHEET OF <br /> 1512 Grand Ave. , #210 CONSULTING GEOTECHNICAL ENGINEERS SUBJECT FILL OBSERVATION s TESTING <br /> Glenwood Springs CO 81601 01 5080Ad 154 Mid Continent Sediment Pond <br /> ' SOIEi FOUNDATION Glenwood Springs.CO 81601 <br /> Attn: Larry Schmueser, .Jr. ENGINEERING <br /> AP=Above Pipe <br /> LABORATORY FIELD <br /> DEPTH <br /> TEST TEST OR MAXIMUM DRY MOISTURE COMPAC- SOIL TYPE <br /> NO LOCATION TYPE ELEVATION DRY OMC DENSITY CONTENT TION <br /> (feet) DENSITY Ixl (Pcf) (%) 1'+1 <br /> IxO <br /> 32 Outlet culvert, SE corner of E. pond, 5' S. N 2' AP 122.1 11.5 116.5 15.4 96 Silty clayey <br /> of S. "C" collar, 2' E. of pipe sandy gravel <br /> 33 Outlet culvert, SE corner of E. pond, 5' S. N Spillway 122.1 11.S 118.1 14.4 97 " <br /> of !E embankment, E of pipe Grade <br /> 34 Outlet culvert, SE corner of. E. pond, 5' N. N Spillway 122.1 ll.5 116.2 15.6 95 " <br /> of E embankment, E of pipe Grade <br /> SPECIFICATION COMPACTION h MATERIAL 95% standard Proctor density ❑ In our opinion, fill generally meets specifications as Indicated by <br /> test no.(s) <br /> ❑ In our opinion, fill does not meet specifications as Indicated by <br /> Type and number of earth moving units- test no(s) and should be removed or reworked <br /> Type and number of compaction units ❑ Fill tested meets specifications <br /> Number of passes thickness of lift ❑ Contractor advised <br /> _ <br /> ❑ Full time observation ❑ Part time observation <br /> Method of adding moisture <br /> PROGRESS REPORT <br /> This report presents opinions formed as a result of our observation of till placement We have relied <br /> on the contractor to continue applying the recommended compactive effort and moisture to the fill <br /> during times when our observer is not observing operations Tests are made of the fill only as <br /> believed necessary to calibrate our observer's Judgement Test data are not the sole basis for <br /> opinions on whether the fill meets specifications <br /> @M0 @ 0 L <br /> Tim Laudick Hans Froeschle <br /> OBSERVER APPROVED BY <br />
The URL can be used to link to this page
Your browser does not support the video tag.