My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-09-26_PERMIT FILE - M2012036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012036
>
2012-09-26_PERMIT FILE - M2012036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:08:37 PM
Creation date
9/27/2012 6:51:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012036
IBM Index Class Name
PERMIT FILE
Doc Date
9/26/2012
Doc Name
Response
From
OSE
To
DRMS
Email Name
TCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />DATE: September 25, 2012 <br />TO: T.C. Wait, Environmental Protection Specialist <br />CC: Division 2 Office; District 67 Water Commissioner <br />FROM: Caleb Foy, E.I.T. CRF <br />RE: Sharp Gravel Pit, File No. M- 2012 -036 <br />Operator: All Rite Paving & Redi -Mix Inc. <br />Contact: Angela Bellantoni, (719) 275 -8951 <br />Sec. 35, Twp. 22S, Rng. 50W, 6th P.M., Bent County <br />CONDITIONS FOR APPROVAL <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® The proposed operation will consume water by: ❑ evaporation, ® dust control, <br />❑ reclamation, n water removed in the mined product, ❑ processing, ❑ other:. <br />The applicant shall purchase a legal supply of water from an appropriate supplier and haul it to the <br />site. <br />COMMENTS: The applicant may contact the local Water Commissioner, Joshua Kasper, for information <br />concerning legal water supplies in the area. Joshua Kasper may be reached by phone at (719) 688 -6711 or by <br />email at ioshua.kasper@state.co.us. <br />RECEIVED <br />$FP ?6 ?012 <br />MGM OF Office of the State Engineer IMRi/ll <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http: / /water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.