Laserfiche WebLink
Differences between amount owed and Division cost estimate(1-23-98) <br /> In Bank $244,061 <br /> Owed $615,887 <br /> Total $859,948 <br /> Estimated Need $967,723 <br /> +5% $ 48,386 <br /> Total $1,016,109 <br /> Deficit $156,161 <br /> Credits which may be applied: <br /> Buildings left in place $16,819(Rock Tunnel) <br /> $12,490(Prep Plant) <br /> subtotal $29,309 <br /> Contaminated surface soils $5,596 <br /> Contaminated subsurface materials $6,487 <br /> Leach fields $5008 <br /> Loadout $78,199 <br /> Total Credit $124,599 <br /> Estimated need minus credits $967,723 <br /> 124 599 <br /> Total $843,124 <br /> +5% $42,156 <br /> Total $885,280 <br /> Deficit $25,332 <br />