Laserfiche WebLink
01-06-99 $211,321.37 Huntsman Project <br /> $216,912.50 Total <br /> AML-Bear Creek Project: 07-16-98 542.87 Seed <br /> 01-01-99 $ 7,593.30 Topsoil <br /> $ 8,136.17 Total <br /> OSM Dutch Creek Div. 07-16-98 47.41 Seed <br /> 01-06-99 $90,252.10 Dutch Ck. Diversion <br /> 02-01-99 $ 69.00 DOH-NPS Permit <br /> $90,368.51 Total <br /> Weed Project/DoAg: 09-28-98 $ 3,400.00 Weed Mgmt <br /> Mid-Cont. Fftcr Acct: 07-16-98 $ 4,109.22 Seed <br /> 07-22-98 102,000.00 Wash Plant Area <br /> 09-09-98 6,760.66 98 Spring Runoff <br /> 09-21-98 540.00 Dozer <br /> 12-28-98 260.00 Backhoe Work <br /> 01-01-99 7,593.30 Topsoil <br /> $121,263.18 Total <br /> No. 17 <br /> Weed Project/DoAg: $ 1,100.00 <br /> Weed Project/Pitkin Co: $ 1,500.00 <br /> OSM Dutch Creek Div: $ 18,097.92 <br /> AML-Bear Creek $211,863.83 <br /> Mid-Cont Fftcr Acct $244,061.29 <br /> No. 18 The Division has made application for several grants in addition to those submitted for the <br /> Huntsman and Dutch Creek Diversion Projects. All pertinent documents relative to the <br /> following requests are located in the respective files. These files are available for <br /> inspection and/or copying: <br /> Old Refuse Pile West; January, 1999; <br /> 4 <br />