Laserfiche WebLink
The estimated cost to vegetatively stabilize the remaining slopes is $165,000. A Civil <br /> Penalty Grant from the Office of Surface Mining in the amount of$110,000 would be <br /> matched by U.S. Forest Service funds in the amount of approximately $25,000. The <br /> Division, using the forfeited bond, would fund the remaining $30,000 and provide <br /> Project design and management services. <br /> The work to be accomplished includes the addition of organic matter to the overcast <br /> material in order to enhance water retention characteristics, construction of thousands <br /> of small benches for seed establishment purposes, aerial application of a tackifier over <br /> mulch to aid in seed protection, and planting of trees and shrubs on, and at the base of <br /> the slopes in order to create natural sediment barriers. These tasks represent a <br /> modification to the methods used in the past at the outslopes. We believe that the <br /> modifications will accommodate the climatic extremes which the area experiences. The <br /> cost of accomplishing these tasks at the outslopes, however, is very high due to the <br /> size, extreme steepness and inaccessibility of these areas. <br /> Please let me know if you require specific information regarding past reclamation efforts <br /> at the Mine Bench Outslopes, or a more detailed description of the work to be <br /> accomplished at these locations. <br /> Cc: Jim Herron <br /> C:\sgrWbsn\sIopegrantosm <br />