Laserfiche WebLink
5TATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 <br /> Denver,Colorado 80203 D I V I S�- O <br /> Phone-(303)866-3567 MINERALS <br /> FAX (303)832-8106 & <br /> GEOLOGYI <br /> RECLAMATION <br /> MINING-SAFETY <br /> Bill Owens <br /> Governor <br /> Date: April 9, 2001 Executive Director <br /> Michael B.Long <br /> Division Director <br /> TO: Jim Fulton <br /> FROM: Steve Renner <br /> David Berry <br /> CC: Michael Long <br /> David Bucknam <br /> Jim Herron <br /> RE: Office of Surface Mining Civil Penalty Grant <br /> The Division of Minerals and Geology is responsible for accomplishing reclamation at <br /> the Coal Basin Mine. The operating permit has been forfeited and the reclamation bond <br /> was revoked. The majority of the forfeited bond was expended to accomplish <br /> reclamation of the site. Reclamation is substantially completed, however, additional <br /> funds, in the form of Office of Surface Mining Civil Penalty Grant monies, are being <br /> sought in order to accomplish some remaining work. Completion of the remaining work <br /> is essential in order to minimize offsite impacts from this highly disturbed site. <br /> One of the major reclamation components undertaken at Coal Basin was stabilization of <br /> the Mine Bench Outslopes. These seven angle of repose slopes consist of <br /> unconsolidated coal and overburden materials which were pushed over the existing <br /> mountainsides during development and operation of the mines. These slopes <br /> experience significant rates of erosion due to the nature of the overcast material, the <br /> extremely steep slopes upon which the material rests and the high amount of annual <br /> average precipitation. The resultant mining related sediment reports to Coal and Dutch <br /> Creeks, the primary drainages within Coal Basin, and ultimately to the Crystal River at <br /> Redstone, Colorado. <br /> The Division has successfully demonstrated a method of stabilizing the Mine Bench <br /> Outslopes using innovative revegetation techniques. The Division has attempted to <br /> revegetate all seven of the slopes using these techniques. Two of the slopes require no <br /> further work, while a third slope'may not require additional work. Unfortunately, it <br /> appears that the revegetation work was less than successful at four of the slopes. We <br />