My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (305)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (305)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:21:30 PM
Creation date
9/25/2012 9:48:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT-METAL MINING(& COAL) <br /> COLORADO DEPT. OF PUBLIC HEALTH &ENVIRONMENT- <br /> Water-Quality Control Divisfon <br /> WQCD-P--B2 <br /> 4300,Cherry Creek Drive South <br /> Denver,Colorado 80246-1530 <br /> Make enough copies of form for each reporting year. Or go to <br /> http://Www.cdphe.state.co.uslwqlPermitsUnitlwqcdp'mt.html , Check box if this is a <br /> new name,address,etc. <br /> Permittee(Company Name): Cc. l v K.+n o a r-y <br /> Facility Name: Cv4-L iS�sn✓ Ss di•�c..-�-j' y�.n /2ec L4?41,1 rfv,v ��a�7�.C_r- _ <br /> Mailing Address: _ 1313 f/�� �-•.. S T �-��'� /� .v v{/t C o • Y4,to 3 — <br /> Facility Phone Number: (3,1 3 ) $" 6 • 3 S! <br /> Permit Certification No. COR-04 - a 2 <br /> Reporting Period: Jan. 1-Dec.31,20 o 3 (Form is due by Feb. 15 of the following year) <br /> **Each section must be completed. Please print or type.** <br /> A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br /> to comply with your Stormwater Management Plan(SWMP),to fully implement it,changes or improvements made <br /> in any of your Best Management Practices(BMPs), employee training, spills,other problems encountered,etc. <br /> How is your plan working?) ., <br /> Were changes made to your SWMP? Its Yes -'Describe changes on a separate sheet. <br /> B. A summary of each comprehensive-stormwater facility inspection made, including date, findings, and action . <br /> taken.- (The permit requires at least two comprehensive'facility inspections per year-see page 8 of the permit. <br /> Include here a summary of those inspections,plus any other comprehensive-inspections made. It is not necessary <br /> to summarize day-to-day inspections,unless significant problems were noted.) <br /> First Inspection-Date fL/_/ 03 Findings,and action taken: <br /> 4-S e /iLTTfe_ ZG n <br /> Mote-form may be reproduced Page 1 of 2 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.