Laserfiche WebLink
STORMWATER ANNUAL REPORT -METAL MINING (& COAL) <br /> COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br /> Water Quality Control Division <br /> WQCD-P-B2 <br /> 4300 Cherry Creek Drive South <br /> Denver, Colorado 80246-1530 <br /> Make enough copies of form for each reporting year. Or go to <br /> http://www.cdphe.state.co.us/wq/Permits Unit/wgcdpmt.html Check box if this is a <br /> new name, address, etc. <br /> Permittee(Company Name): Co a A It/s ¢- G t r! e y <br /> " 1 ` <br /> Facility Name: C�' /ts Ss d t~..-r /.o /� <br /> u�1 /C e c //.�-r A-7/c�-- /�?"J't e-.,— <br /> Mailing Address: /3/ 3 0 c...v e ti c a 5-C. 2- 3 <br /> Facility Phone Number: (3-3 ) 8(,( 3 S4- <br /> Permit Certification No. COR-04 - O ;L- o <br /> Reporting Period: Jan. 1-Dec. 31,20 0 (Form is due by Feb. 15 of the following year) <br /> **Each section must be completed. Please print or type.** <br /> A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br /> to comply with your Stormwater Management Plan(SWMP),to fully implement it, changes or improvements made <br /> in any of your Best Management Practices (BMPs), employee training,spills,other problems encountered, etc. <br /> How is your plan working?) <br /> Were changes made to your SWMP? No Yes - Describe changes on a separate sheet. <br /> B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br /> taken. (The permit requires at least two comprehensive facility inspections per year- see page 8 of the permit. <br /> Include here a summary of those inspections,plus any other comprehensive inspections made. It is not necessary <br /> to summarize day-to-day inspections, unless significant problems were noted.) <br /> First Inspection - Date 6/_/-O.-Findings, and action taken: <br /> Note-form may be reproduced Page I of 2 <br />