My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (304)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (304)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:19:06 PM
Creation date
9/25/2012 9:36:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPARTMENT OF PUBLIC HEALTH&ENVIRONMENT- Water Quality Control Division <br /> Rationale -Page S Permit No. COR-040000 <br /> IV. STORMWATER DISCHARGES ASSOCIATED WITH MINING OPERATIONS (cont.) <br /> D. Exemption for Pre-operational Mines <br /> Pre-operational mining sites are not required to obtain stormwater mining permits. The definitions of active and <br /> inactive mining sites do not include sites where mining claims are being maintained prior to any disturbances <br /> associated with the extraction, beneficiation, or processing of mined materials, nor sites where minimal activities are <br /> undertaken for the sole purpose of maintaining a mining claim. Construction stormwater permit requirements apply <br /> if more than I acre of land is disturbed, including clearing, grading and excavation; however, sites disturbing <br /> between 1 and S acres are not required to obtain permit coverage until July 1, 2002 (see CDPS General Permit <br /> number COR-030000). <br /> As clarification, claims on land where there has been past extraction, beneficiation, or processing of mining <br /> material, but there is currently no active mining, are considered inactive sites and are subject to stormwater <br /> regulations. <br /> E. Exemption for Uncontaminated Stormwater <br /> The Division does not require a permit for discharges of stormwater that do not contact any overburden, raw <br /> material, intermediate products, byproducts,finished products or waste products located at the mining operation. <br /> Only stormwater discharges that comes into contact with any overburden, raw material, intermediate products, <br /> byproducts,finished products or waste products located at the mining operation must be included in the permit. <br /> F. Exemption for Reclaimed Mines <br /> Mines that have met certain reclamation conditions are not required to obtain a stormwater discharge permit. Coal <br /> mining operations which no longer meet the definition of a reclamation area under 40 CFR 434.11(1) because the <br /> performance bond issued to the facility by the appropriate SMCRA authority has been released are not required to <br /> obtain stormwater discharge permits. Non-coal mining operations which have been released from applicable state or <br /> Federal reclamation requirements after December 17, 1990 are also not required to obtain stormwater discharge <br /> permits. The Division may designate such reclaimed sites as requiring a stormwater permit if the discharge is a <br /> significant contributor of pollutants to waters of the State. <br /> G. Exemption for Small Municipalities <br /> The Intermodal Surface Transportation Efficiency Act of 1991 Section 1068(c)added an exemption to the stormwater <br /> regulations for municipalities with less than 100,000 population. The term "municipality"includes cities, towns, <br /> counties, special districts or any entity created by or pursuant to State law. <br /> Stormwater discharges associated with mining or remediation activities, that are owned or operated by a small <br /> municipality are not required to apply for or obtain a stormwater permit until March 10, 2003. (Note: This <br /> exemption does not apply to other,privately owned industries within the same small municipality.) The Division <br /> plans to develop a new general permit for municipally-owned industries in late 2002, which will likely include metal <br /> mining operations and mine-waste remediation projects. <br /> V. APPLICATION AND CERTIFICATION <br /> Certification under the permit requires submittal of an application. Upon receipt of all required information, the Division <br /> may allow or disallow coverage under the general permit. See Parts I.A.3 and I.A.4 of the permit for an outline of the <br /> application requirements and applicable time frames. <br /> At least thirty days prior to the anticipated date of discharge, the owner (or operator when the owner does not operate the <br /> facility) of the mining or remediation operation shall submit an application to the Division. (Note: Under the Federal <br /> regulations, this is referred to as a Notice of Intent, or NOI. For internal consistency with its current program, the <br /> Division will continue to use the term "application.") If this general permit is applicable, then a certification will be <br /> developed and the applicant will be certified under this general permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.