Laserfiche WebLink
STORMWATER ANNUAL REPORT-METAL MINING(& COAL) <br /> COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br /> Water Quality Control Division <br /> WQCD-P-B2 <br /> 4300 Cherry Creek Drive South <br /> Denver,Colorado 80246-1530 <br /> Make enough copies of form for each reporting year. Or go to <br /> http://www.cdphe.state.co.uslwqlPermitsUnitlwqcdpmt.html Check box if this is a <br /> new name, address, etc. <br /> Permittee(Company Name): Cc,I&1 r10 17 t�rsii� �G /`7i�.l rl s ,•- �a/d s-y <br /> Facility Name: Cv,r( 6A S 41^- /Z4L c I If-01-4-71 Cc, S r/R&-c r7&— c P3 <br /> Mailing Address: /313 Shy/L e-Y • r r- d Z r f- Dt ti f..e 2 c a IT Ci t!/-7 <br /> Facility Phone Number: ( 3,3 ) �G ,( - 3 S-4 } <br /> Permit Certification No. COR-04 <br /> Reporting Period: Jan. 1-Dec. 31,20 0 (Form is due by Feb. 15 of the following year) <br /> **Each section must be completed. Please print or type.** <br /> A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br /> to comply with your Stormwater Management Plan(SWMP),to fully implement it,changes or improvements made <br /> in any of your Best Management Practices (BMPs), employee training, spills, other problems encountered,etc. <br /> How is your plan working?) <br /> Were changes made to your SWMP? C Yes -Describe changes on a separate sheet. <br /> B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br /> taken. (The permit requires at least two comprehensive facility inspections per year- see page 8 of the permit. <br /> Include here a summary of those inspections,plus any other comprehensive inspections made. It is not necessary <br /> to summarize day-to-day inspections,unless significant problems were noted.) <br /> First Inspection -Date 6110 SFindings,and action taken: <br /> Note-form may be reproduced Page 1 of 2 ar6/961t <br />