Laserfiche WebLink
I, <br /> 13. For each outfall provide in the table below, include the following : (1)The average and maximum flow expected from each outfall; (2)A <br /> t discussion of the treatment provided, (3)The name of the receiving stream. Indicate flow rates as gpm or MGD. <br /> OUTFALL TREATMENT AND FLOW RECEIVING STREAM <br /> NUMBER TREATMENT AVG. FLOW MAX. FLOW <br /> 14. Analytical data for the following parameters shall be submitted from at least one sampling of each discharge point. See instructions. If no <br /> water is currently available for analysis, so indicate. <br /> Alkalinity(mg/1) Oil&Grease(mg/1) <br /> pH (s.u.) COD(mg/1) <br /> Total Suspended Solids(mg/1) Total Dissolved Solids(mg/1) <br /> _No water to analyze at this time. <br /> The Division may request analysis of other parameters once the application has been reviewed. <br /> Note to the applicant:If the Division requests a representative analysis of the water which will be discharged,the application process time <br /> may be lengthened. <br /> 15. Is or will land application of any wastewater be practiced for purposes other than reclamation or dust control? <br /> ❑ YES ❑ NO Will there be a discharge from this area? ❑ YES, ❑ NO <br /> 16. Is this operation located within one mile of a landfill, or any mine or mill tailings'? ❑ YES, ❑ NO <br /> Will dewatering take place on the site of an abandoned landfill'? ❑ YES, ❑ NO Has the dewatering area been checked for possible <br /> groundwater contamination, such as plumes from leaking underground storage tanks,etc? ❑ YES ❑ NO If YES,please show <br /> location of the landfill,tailings or possible groundwater contamination on the location map(7)or general sketch map(8). Please explain the <br /> location,extent of contamination,possible effect on the groundwater pumping from this facility,please submit analysis of the parameters. <br /> Note: Please contact Water Quality Control Division for the proper parameters to report. <br /> Note to the applicant: If the Division must request a representative analysis of the water to be discharged,the application process time may <br /> be lengthened. <br /> 17. Will flocculants(settling agents or chemical additives)be used to treat water prior to discharge? ❑ YES, ❑ NO <br /> If YES,specify chemical used and submit Materials Safety Data Sheet(MSDS). <br /> 18. Estimated life of the activity from which the discharge(s) identified in item 13. _Years or Months. <br /> 19. When will construction and dewatering begin? <br /> 20. Are there downstream water supply intakes within 5 miles of this facility? ❑ YES, ❑ NO <br /> DEWATERING AW (3) <br />