Laserfiche WebLink
13. For each outfall provide in the table below,include the following: (1)The average and maximum flow expected from each outfall;(2)A <br /> discussion of the treatment provided, (3)The name of the receiving stream. Indicate flow rates as gpm or MGD. <br /> OUTFALL TREATMENT AND FLOW RECEIVING STREAM <br /> NUMBER TREATMENT AVG.FLOW MAX. FLOW <br /> S72/►w lig(r5 12&c 4 r, fcs 3 /'1 Cv.fc- C/L e e-K <br /> 14. Analytical data for the following parameters shall be submitted from at least one sampling of each discharge point. See instructions. If no <br /> water is currently available for analysis,so indicate. <br /> Alkalinity(mg/1) Oil&Grease(mg/1) <br /> off(s.u.) COD(mg/1) <br /> Total Suspended Solids(mg/1) Total Dissolved Solids(mg/1) <br /> _No water to analyze at this time. <br /> The Division may request analysis of other parameters once the application has been reviewed. , <br /> Note to the applicant:If the Division requests a representative analysis of the water which will be discharged,the application process time <br /> may be lengthened. <br /> 15. Is or will land application of any wastewater be practiced for purposes other than reclamation or dust control? <br /> ❑ YES 12 NO Will there be a discharge from this area? ❑ YES, ❑ NO <br /> 16. Is this operation located within one mile of a landfill, or any mine or mill tailings? ❑ YES, L"J NO <br /> Will dewatering take place on the site of an abandoned landfill? ❑ YES, LJ NO Has the dewatering area been checked for possible <br /> groundwater contamination,such as plumes from leaking underground storage tanks,etc? 13 YES ❑ NO If YES,please show <br /> location of the landfill,tailings or possible groundwater contamination on the location map(7)or general sketch map(8). Please explain the <br /> location,extent of contamination,possible effect on the groundwater pumping from this facility, please submit analysis of the parameters. <br /> Note: Please contact Water Quality Control Division for the proper parameters to report. <br /> -57'01f'?6C- -7/t-!( Iae�frI.— C,:XL'fv1+tco /Qfg 15,, 1,12ewiv•5 rio...�rt�li�t/l.fTGR. <br /> 4--fXC�4✓4r/oti evN+�(rf-K4 (­,-D-M S de,1vist�A, v� yw-ea/a�t,441CIt /}.v0 es7l✓YRcw✓+lrv�AL <br /> Note to the applicant: If the Division must request a rct+resentative analysis of the water to be discharged, the application process time may <br /> be lengthened. <br /> 17. Will flocculants(settling agents or chemical additives)be used to treat water prior to discharge? ❑ YES, L`TNO <br /> If YES,specify chemical used and submit Materials Safety Data Sheet(MSDS). <br /> 18. Estimated life of the activity from which the discharge(s)identified in item 13. _Years or---L_Months. <br /> 19. When will construction and dewatering begin? �/7/"►e 0i9 f�l> /��— /�/lv 6//�S <br /> 20. Are there downstream water supply intakes within 5 miles of this facility? ❑ YES, 0 NO <br /> DEWATER GIN3 (3) <br />