' 6. ' Industrial Activity: Describe the primary industrial activities which take lace on site. Include the. P type of facility (undergrounE, mine,
<br /> surface mine, etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining
<br /> and coal preparation processes where applicable. (The applicant may want to submit a process flow sheet.)
<br /> Office and parking lot; covered warehouse for equipment which is being sold, or
<br /> will otherwise be disposedoug scrap. The pro y is or sae as an asset`—'
<br /> of the bankrupt estate of Mid-Continent Resources, Inc. No coal handling or storage
<br /> has OC=rpd a th i G site to g ince_sTaWanV 1991,
<br /> 7. Indicate whether an exploratory,active mining, inactive mining, or post mining operation or is the site in temporary cessation.
<br /> None. Mining related activity has permanently ended at this site.
<br /> If exploratory, please submit any known water quality/quantity data relative to the discharge(s)and the receiving stream(s)that reflect the
<br /> conditions prior to the present activity, the length of time the activity is expected to be under exploration and describe what activities will
<br /> take place during exploration that could have an impact on the quantity or the quality of the discharge. If post training, describe areas
<br /> affected and extent of reclamation completed and length of time elapsed since revegetation occurred. Also, specify whether any outfalls
<br /> previously described serve,partially or totally, a reclaimed area. Include expected bond release date.
<br /> Not applicable.
<br /> 8. Production: List the principal product(s)produced and current and maximum production rates.
<br /> None. Coal production ceased January, 1991. Closure is Pe_r_rent.
<br /> 9. Is this a seasonal operation? No ® Yes ❑ If Yes, please list the months of operation.
<br /> 10. Intermittent Discharges:Except for storm runoff, are any of the discharges described in item 21 intermittent or seasonal?
<br /> No � Yes ❑ U Yes, describe the frequency,duration and flow rate of each discharge occurrence.
<br /> 11. Location Map: A 81A x 11 inch location trap designating the facility property, intake points, discharge points, each of its hazardous waste
<br /> treatment storage or disposal facilities, areas in post mining, each well where fluids from the facility are injected underground,those wells,
<br /> springs, other surface water bodies and drinking water wells listed in public records or otherwise known to the applicant and the receiving
<br /> waters shall be submitted. The map shall extend one mile beyond the property boundaries. The map shall be from a Th or 15 minute USGS
<br /> quad sheet,or a map of comparable scale. A north arrow shall be shown. A larger map may be included for reference if the permittee
<br /> wishes.
<br /> 12. Site Map: A 81A x 11 inch map of the site shall be submitted showing facility features(whenever possible)such as buildings, ponds,
<br /> diversion ditches, stream locations, numbered discharge points, sampling and flow monitoring points, land application areas, stockpiles, waste
<br /> rock piles, topsoil piles, location of french drains and/or spoils springs, crusher areas,mine drainage flow paths, domestic wastewater
<br /> treatment plants, power plants, truck washing areas,explosive storage areas,parking lots, vehicle maintenance areas,chemical storage areas,
<br /> etc. The outfalls shall be labeled to correspond with the numbers listed in item 21. A larger map may be included for reference if the
<br /> permittee wishes.
<br /> 13. Water Balance: Attach a line drawing showing all water flow through and from the mine/preparation plant sites. Indicate sources of intake
<br /> water, operations contributing wastewater to the effluent, and treatment units labeled to correspond to the more detailed descriptions in item
<br /> 21. Construct a water balance on the line drawing by showing average flows between intakes, operations,treatment units and outfalls. If a
<br /> water balance cannot be determined,provide a pictorial description of the nature and amount of any sources of water and any collection or
<br /> treatment measures. If not applicable,please indicate.
<br /> Coal Mining App.4/96 2
<br />
|