Laserfiche WebLink
27. for Dio3dn 7,��-achlo h applicant <br /> mo report q if it: <br /> data, generated using a screening procedure not calibrated with analytical smndarc+s, <br /> (a) Uses or =-nufac2ares 2.4,5-trichlorophenoxy acetic acid ( ,4,5.-T; -,4,5-trichlorophenoxy)propanoic acid (Silvez, 2,4,5,-TP); -% <br /> C' - o o ptcaol (TCP) or hexachi orophenoxy) ethyl, tcnene propionaLe-tCP or �T bon.); 0,0 dune hyl O( ,4,5-�c:lorphenyl) phcsproroth:oate(Ronne]); 2,4,5_ <br /> CO. i-.ews or has r-son to believe t:.at TCDD is or may be present ii an efluenL <br /> :S. Whole Eflluent Toxicity Testing: C4z, testing shall be conducted for each eu-_�all which is not solely made up e{;;ormvater or domestic <br /> wastewater, unless waived by the Division, on JOG, effluent using both Cenocanhnia dubia and ffathead runnoc s. This requirement s <br /> waived where routine resnng is currcntly -ec ed under an existmg CDPS pc.:tt_ T'nc test Shall low flow to e:luent desi�^ Sow s less W n ' be an acute test unless the ratio of stream <br /> d iC:l, respectively, and the rec-rvtrg stream has a Class I Aquatic Life Use or Class 2 Aquatic <br /> Life ire with all al appropriate aquatic lap numeric sardards. In the lac_..-r case, a chronic test is required. The Division reserves the ;-fight <br /> to rect additional testing as part of�the application review process. If so required, the permit application wilt not be considered complete <br /> until the additional testing is submitted. In addition, all applicants must identify any biological toxicity tests which have been performed <br /> within the last 3 years on any of the discharges or the receiving water in relation to a discharge from this facility. Mach C,'ET tat resale o <br /> this application. <br /> 29. Priority Pollutant Scan: The results of a priority pollutant scan,unless waived by the Division, for the volatile and acid fractions as shown <br /> in Appendix A must be submitted of each discharge which is not solely made up of stormwater or domestic wastewater. This requirement is <br /> waived for iaciIities where the probable total annual production is less than 100,000 tons per year. <br /> 30. Additional Monitoring: All applicants must review the parameters listed in Appendix A and Appendix B to this application and indicate <br /> whether any of these pollutants are known or believed to be present. For every pollutant expected to be discharged, the applicant must <br /> briefly describe the reasons the pollutant is expected to be discharged and report any quantitative data for the pollutant <br /> None . <br /> 31. DMG Monitoring: Please submit a copy of summaries of all water quality monitoring data of ourfalls or receiving streams for which data <br /> has been gathered over the Un five years for the miring site and which is required by the Division of Minerals and Geology. If not already <br /> submit.�d to the Division, the plan which details the monitoring frequency,type, locations and method of analysis must also be submitted. <br /> 32. Bulk Storage: Do you have bulk storage of diesel fuel, gasoline,solvents or other hazardous materials or.site? No 9 Yes ❑ If <br /> Yes. briefly Est materials, their quantity, measures taken to ensure that spills do not enter state waters and indicate their location on <br /> site sketch, Item L'. <br /> -' <br /> For renewal applications, Iist the date when the most recent Materials Containment Plan was submitted. See attached <br /> Activity Duration: When did the mining operation commence? 1956 Estimated life of the activity `•n d e d 19 91 <br /> - years. <br /> 34. Pollution Prevention Plans: Please describe any pollution prevention or bat management plans currently in place that could result in the <br /> improvement of water quality. These could include solvent recyclingrogra..s, material P containment procedures,education, etc. <br /> Ongoing reclamation of the former mine site . <br /> 35- Ffistoric Dra=2-ges: Does hi:,onc drainage exist,at the sit--, which is not covered under a CDPS permit? Yes ❑ No ❑ If so, <br /> piease provide a ..tip showing the location of the disc.arges and copies of all ana!y— al informarion on the dischar�a. Please sample the <br /> dsc`ta ga for �c pa am-tees listed m ire 25 and submit Lhbse results. Thu requirement may be waived by the Iivision if suitable data on <br /> e disc3e's hisioric quality -.ss. <br /> 36. Additional Information: Phase include anv other iaforttation that you .'eel the Divsicn should be aware of s d.-aitirg this permit Include <br /> here any low or ream dam that you woulc like consieered. A=ah pages as necessary, <br /> See t aC'In ed . 1`'fld-CC n __P_ent 15 nC 10' ^er Owner Of -Operty MC 1S <br /> p r D. <br /> cat rec l amat_cn wit. n nC] Gz�:C� G� <br /> ; La . declamation is nearing completion . <br /> 37. Stormwater Discharges: All active and inactive coal ;nines must be covered by a 7,0rnwarer permit If your facility does not already have <br /> a stornwater permit, complete Appendix C-1 and submit in addition to this application. ALSO, SEE ITEM 38. <br />