� 1
<br /> 6. Industrial Activity: Describe the primary industrial activities which rake place on site. Include the type of facility (underground mine, ,
<br /> su.-face mine, etc.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining
<br /> and coal preparation processes where applicable. (The applicant may wall: to submit a process flow sheet_)
<br /> `�O, Mirir�7 r^e? cer; in ICC1 C fa A r iI C! 1a�,-c } o7n roT+ln;�cr7
<br /> raw coal storace a r e a S been Graded and Covered , nortalS ^a`.e been
<br /> sea-ed . az.._ il' +rg an_ seedi ve been complete_ at mime
<br /> zortal areas , aria roacsto several portals have been reclaimed .
<br /> Lamphouse and one metal building remain .
<br /> 7. Indicate whether an exploratory, active raring, inactive mining, or post mining operation or is the sire in t--mporarr cessation.
<br /> Post mining . Reclamation is being carried out by the EM^ .
<br /> If exploratory, please submit any known water quality/quantiry data relative to the discharge(s) and the receiving strearn(s) that reflect the
<br /> conditions prior to the present activity, the length of time the activity is expected to be under exploration and describe what ac:ivitics will
<br /> take place durctg exploration that could have an impact on the quantity or the quality of the discharge. If post mining, describe areas
<br /> affected and extent of reclamation completed and length of time elapsed since revegeation occurred. Also, specify whether any outfalls
<br /> previously described serve, partially or totally, a reclaimed area. Include expected bond release date.
<br /> Ni r
<br /> 8. Production: List the principal product(s)produced and current and maximum production rates.
<br /> None
<br /> 9. Is tkis a seasonal operation? No ❑ Yes ® If Yes, please list the months of operation.
<br /> tier•� �T�+, tar.,. ; T_; L. Lti..
<br /> 10. Intermittent Discharges: Fxccpt for storm runoff, are any of the discharges described in item 21 intermittent or seasonal?
<br /> is
<br /> No ❑ Yes L I If Yes, describe the frequency, duration and flow rate of each discharge occurrence.
<br /> r,r% _, r14 - -, - _ -1
<br /> as cnowmel` occurs & migrates into the underarond workings from
<br /> which a pipe drains tc the. 003 sump. Est flow of 10 gpm.
<br /> 11. Location Dian: A 81_ x 11 inch location map designating the facility propery, intake points, discharge points, each of its hazardous was_
<br /> t eat tent storage or disposal facilities, areas in post mining, each well where fluids from the facility are injected underground,those wells,
<br /> springs, other surface water bodies and drinking water wells listed in public records or otherwise known to the applicant and the receiving
<br /> waters shall be submitted. The map shall extend one mile beyond the property boundaries. The map shall be from a 71h or 15 minute USGS
<br /> quad she_;, or a map o`comparable scale. A north arrow shall be shown. A larger map may be included for reference if the permiaee
<br /> wishes.
<br /> 1Z. Site Map: A 8?i x 11 inch map of the sit-- shall be submitted showing- facility features (whenever possible) such as buildings, ponds,
<br /> diversion ditches, seam locations, n:mbered discharge points, sampling and flow monitoring points, land application areas, stockpiles, ws:e
<br /> rock piles, topsoil piies, location of french dntns and/or spoils springs, crusher areas, mine drainage flow paths, domestic wastewater
<br /> tr=trten:plants, power plants, tuck washing areas, explosive storage areas, parking lots, vehicle maintenance areas, chemical storage areas,
<br /> et:. :tie oucaLs shall be labeled to correso- nd with the numbers listed in item,21. A larger snap may be included for reference if the
<br /> pc^tt wshes.
<br /> Water Balance: Attach a line drawing showing all water flow through and fom the mine:nr--paration plant sites. Indicate souses of intake
<br /> water, oO_radons contributing wastewater to the effluent, and tre:irmcnt units labeled to correspond to the more detailed descriptions in i=rn
<br /> '_1. cons_-=a water balance on the line drawing by showing average flows between intakes, operations,..='✓tent units and outalls. If a
<br /> water balance zanaot be de:crmined. provide a ptaonal descnpuon of the nature and amount of any sources of water and any coIlccrep or
<br /> treatncnt measures. If not appiicable, please indicate.
<br />
|