Laserfiche WebLink
areas; roughening of surfaces such as the pond embankments and the short access roads in order to promote infiltration <br /> and dispersal of flows,construction of small retention berms; diversion of up-gradient flows; and reve-etation of <br /> embankments, access roads and pond margins. These measures will be implemented during construction and will be <br /> maintained as access allows,until the Division completes its reclamation activities in Coal Basin. We believe that <br /> these efforts will provide a reasonable level of sediment control from the construction areas. As stated above, mine <br /> maintenance would continue for a limited time, and then DMG would request permit termination. <br /> If you have questions or comments,or require further information,please leave a message for me at the phone number <br /> below. <br /> We would appreciate WQCD's immediate attention to this matter,and request a response from Water Quality Control <br /> by Friday,May 7, 1999. Please FAX your response to us at(303) 832-8106,Attention: Glenda Williams. <br /> Sincerely, <br /> en C.Renner <br /> Project Manager <br /> (970)241-0336 <br /> CC: Michael Long <br /> David Bucknam <br /> Cheryl Linden <br />