Laserfiche WebLink
STATE OF COLORADO <br /> DIVISION OF MINERALS AND GEOLOGY <br /> Department of Natural Resources ,��°4 e�O� <br /> Fc <br /> O <br /> 1313 Sherman St.,Room 215 « « <br /> Denver,CO 80203 «,r 1876," <br /> Phone:(303)866-3567 <br /> FAX:(303)832-8106 <br /> Roy Romer <br /> Date: July 28, 1993 Governor <br /> Michael B.Long <br /> To: Bob Nondorf,, Division of Purchasing Division Director <br /> From: Bruce Stover, Division of Minerals and Geology <br /> RE: Twin Pines Maintenance Telephone Bid <br /> As I disscussed with you on July 20, our Division is undertaking <br /> repairs to a rock and concrete drop structure which was originally <br /> constructed as part of one of the large strip mine reclamation jobs <br /> done in the mid 1980's near Cafion City: The structure was damaged <br /> in a large flood late last summer, and needs to be repaired so that <br /> the entire structure is not destroyed by subsequent flash floods. <br /> I contacted four local contractors who expressed an interest in the <br /> work: <br /> Patch Construction; Florence CO <br /> Azco Construction, Penrose CO <br /> Kessler Reclamation., Rockvale CO <br /> G.E. Riggin Construction, Penrose CO <br /> A site showing was held at 10:00 am on Wednesday, July 21, 1993. <br /> All contractors except G.E. Riggins attended the pre-bid meeting, <br /> and were furnished the attached work description and bidding <br /> criteria document. The work was described to the three contractors <br /> present, and site conditions and equipment access were inspected. <br /> The closing time for bids was 12:00 noon on July 26, 1993. <br /> The following bids were received by telephone: <br /> Kessler Reclamation $7,720.00 <br /> Patch Construction 9,525.00 <br /> Azco Construction 13,500.00 <br /> Attached is the written bid quote from Kessler Reclamation, and a <br /> signed Bid Schedule for the Project. Please expedite a Purchase <br /> order for the work, and don't hesitate to call me if you have any <br /> questions. Thanks! <br />