Laserfiche WebLink
EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? C/ <br />Yes No <br />2). Is erosion occurring at any section of the emergency spillway? <br />Yes No <br />Describe extent <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No <br />Explain: /1hh , c+-P p e U , � l a X Z_ rte-, .9 /Iry+t <br />P t/btQ.v�! oc.-C A.,14 ,/,(,„—_ <br />OTHER OBSERVATIONS <br />t.k.P. <br />MSHA Qualified Impoundmelnt Inspector <br />Date <br />4,14, l t ,( <br />Page 2 of 2 <br />New Elk Mine <br />9/13/2012 <br />