Laserfiche WebLink
0 <br />6. Monitoring Reclamation Success <br />Monitoring the reclamation on an ongoing basis will allow minor revisions to assure <br />successful reclamation. If minor changes or modifications are needed to the seeding and <br />reclamation plan, revision plans will be submitted to the Division as required. All areas <br />disturbed and reclaimed and any other important items regarding the reclamation will be <br />submitted in the annual reports to the Division. <br />15 <br />